Case Study 4

This property has been through many changes over the years once being a public house and later a surf lodge for a number of years, and was in need of a total over haul as the clients wanted to let the property for a couple of seasons.

So a new kitchen was fitted and a lot of the rooms needing re-plastering and redecorating in this 3 story building extensive electrical work and plumbing brought the building back to its former glory. Outside the swimming pool was drained down so to clean and work to the patio was needed. We fenced the pool area in for added privacy as this had become seriously overgrown with hedgerow and trees. A new pool cover was added to bring the pool area back to a high spec for the customers to use.

Although future plans to knock the building down are in the pipe line for a new lovely seaside home the revenue generated from the lettings has far surpassed the money spent on the refurbishment showing our clients far sighted vision and help generate income for the future build.   All this work was carried out in 5 weeks.

Information